• Measuretheincominggaspressure.-Minimuminletgassupplypressureof4”w.c.andmaximumis11.0fornaturalgasor
8”w.c.minand13.8maxforpropane.Themaximumvaluespeciedmustnotbeexceededunderbothloadandnoload
conditions.Ifthisconditioncannotbeobtainedapositivelock-uptypepressureregulatorMUSTbeinstalledapproximately
vefeetawayfromthegasvalveoftheboilerandpertheregulatormanufacture’sinstructions.
• Checkallgassupplylinesforleaks.
• Checkthatallventingisproperlyinstalledinaccordancewiththeventingsectionoftheinstructionmanual.
Follow the lighting and operating instructions in the Instruction Manual.
IV. Boiler Start-Up
Starting the boiler for the rst time
-Theboileristestedatthefactoryandshouldstartproperlyifinstalledinaccordancewiththeboiler’sinstructionmanual.
- Before starting the boiler, refer to the temperature set-point procedure section in the boilers instruction manual.
-Turnontheboiler’son/offswitch.Ensuretheoperatingsetpointissethighenoughtoactivateacallforheat.Ifanexternal
controlisusingtheboiler’sEnable/Disablecircuit,ensurethattheexternalcontrol’scontactsareclosed.Ifthereisno
externalcontrol,ensurethatthetwowiresprovidedforthiscircuitarewire-nuttedtogetherinthejunctionboxontheback
oftheboiler.Refertothewiringdiagramontheboiler.
- Allow the unit to run for at least 10 minutes before proceeding with the combustion analysis. Take a combustion sample and
record CO and CO
2
or O
2
readings.
Setting of the test mode
-OnUIMgotomainmenu,scrolldowntousersettingsandpressselect.ScrolldowntoMODmode,pressselect.Use
theupanddownkeystoselectoptions:MIN(MINIMUMFIRINGRATE).MAX(MAXIMUMFIRINGRATE).MOD(FOR
AUTOMATICMODULATIONMODE).Pressselectforthedesiredoption.ForcheckingthecombustionsetuponMINor
MAXtheboilerwillremaininthisstatefor20minutesbeforedefaultingtotheMOD(modulation)mode.
MAXIMUM FIRE ADJUSTMENT
- Combustion sample
-Firstsetboilertothe“TestModeMax,”asdescribedabove,toachievemaximumringrateoftheboiler.Checkcombustion
readingsusingacombustionanalyzer.Ifcombustionreadingsarenotinaccordancewiththechartbelowadjustasfollows:remove
theat,round,blueplasticcapfromthecover.Usinga3mm(7/64”)hexwrench,turntheadjustmentscrewcounterclockwiseto
increaseorclockwisetodecreasegasowandachievethedesiredCO
2
level. See Table referenced below for correct settings.
TherewillbeaslighttimedelaybetweentheadjustmentandtheresponseoftheCO
2
measuringinstrument.Adjustthesettings
insmall1/16incrementsandallowthecombustionreadingstostabilizebeforereadjusting.Whendesiredadjustmentsare
complete, reinstall the blue plastic cap on the cover. Combustion samples shall be taken within 8 inches from the rear boiler.
IMPROPERADJUSTMENTCANCAUSEINCOMPLETECOMBUSTIONRESULTINGINDEATH.
MINIMUM FIRE ADJUSTMENT - Combustion sample
-Nextsetboilertothe“TestModeMin,”asdescribedabove,toachieveminimumringrateoftheboiler.Checkcombustion
readingsusingacombustionanalyzer.Ifcombustionreadingsarenotinaccordancewiththechartshownbelowadjustas
follows:removethemetalcaponthegasregulatorusingaslottedscrewdriver.Thiswillexposetheoffsetadjustmentscrew.
UsingaTORX®T40ora5mmhexwrench,carefullyadjustthelowregassettingtoachievetheCO
2
level prescribed
inbelowreferencetable.Note:TherotationoftheLowFireadjustmentisoppositeoftheHighFireasfollows:Clockwise
rotationincreasesgasow,counterclockwiserotationdecreasesgasow.Adjustmentstotheoffsetpressureregulators
shouldnotexceed1/16incrementsatatimebeforeallowingthereadingstorespondandstabilize.Afterproperlowre
offsetadjustmentismade,reinstalltheslottedcapontheregulator.
Followingallgasvalveadjustments,checkforproperlight-offandverifycorrectfuel/airmixduringtestmodeprocedureprescribedabove.
Ifadjustmentshavebeenmade,repeatthecombustionsamplingusingthe“TestMode”proceduretoinsurethatthereadingsremain
withintheranges.IfthereadingsarenotinaccordancerepeattheHighandLowreadjustmentprocedure.
IMPORTANT!! The Min Mode and Max Mode are used for checking combustion during start up. Return boiler to Mod Mode after
checking combustion.
Combustion readings should fall within the ranges listed in the table below.
Combustion Samples Acceptable Range
% CO
2
, for Natural Gas @ max input 8.0% - 9.5%
% CO
2
, for Propane Gas @ max input 8.5% - 10.0%
CO PPM < 200 PPM
% CO
2
, for Natural Gas @ min input 6.5%-7.5%
% CO
2
, for Propane Gas @ min input 7.5%-8.5%
CO PPM < 100 PPM